| Name: | | MsProjectHealth | | Version: | | 1.0.0.0 | | Publisher: | | Adept | |
The following prerequisites are required: | |
- Windows Installer 3.1
- .NET Framework 3.5 SP1
|
If these components are already installed, you can launch the application now. Otherwise, click the button below to install the prerequisites and run the application.
| |
|
|